Thursday, March 25, 2010

Current site status


These are from middle of March.

The flat has been wired up. The electrical sockets, services and plumbing have been prepared. The floor is now being prepared for the tiles and its finish. The suspended ceiling is to be made. The heater connections (under the window sill) have been inserted to receive the boilers.

The kitchen in the Joiner's workshop.

The white crystal quartz is the surface top material for the cooking side of the island and the treated timber is for the dining side of the island.

Detail of where the two island surface tops meet.

The clients measuring up the space for their sofa within the living room area.

(left) the windows that sit in front of the shower room
(right) the shower room itself that is to be tiled once the plumbing is completed