Recently Ive been combining my oil paintings with my architectural drawings to create spatial environments that have a textural and material quality. The paintings are oil on canvas whereas I layered different densities and thicknesses of paint and two dimensional shapes to create a shifting sense of space. The architectural drawings however are more narrative based - extracting a scene from a site or collaging many scenes at different scales of a site together so the experience of the site is depicted in its entirety in the one frame.
The image above is an over head view of the EUR site that extracts the phenomenal relationships between key componants and buildings of the site, and sets it against the regular grid like organisation of its urban layout. The two readings of the urban layout is that one is a result of a pedestrians visual memory and perception and the other is an architects measured division and zoning of a site.
The second image explores the same site as an interior; as a material that is effected in time; and as an overall arrangement of objects all at the same time. The viewer experiences a place in detail and in an overall view simultaneously. The place is remembered for all its parts. I really like the sensorial result of combining the paintings with the drawings so far. I think that there is something cinematic occuring and would like to explore the connection between constructing a spatial quality and narrative more.
Monday, February 21, 2011
Tuesday, November 2, 2010
Completed refurbishment
Its been a while since posting updated info about the flat. Works were pretty much completed on site in September. There are some interior finishes and furniture that we are still working on, for instance in the living room, (as you can see in some sketch renders that I've posted below). But these are to be completed within the next couple of months as the clients are currently happily living in the flat after moving into it at the end of summer.The kitchen has turned out particularly successfully in its arrangment and finishes and is definitely the main social space of the flat. We are now just wanting to dress the lounge room more by creating feature furniture so that these two rooms set each other off nicely.
Entrance
Before & after: Main corridor (with new wardrobes)
Before & after: (left) main bathroom (right) service bathroom
Bespoke joinery in main bathroom & the shower room
Detail shots of bespoke wardrobe in bedroom
Before & after: kitchen showing island/dining table
Kitchen
Lounge room leading off of kitchen
Furniture items we're currently developing for this room
Showing different types of storage spaces within bench
Sunday, October 31, 2010
Nested House Wave interference screens

Below are some shots of an ongoing project with UFO , for some 5-axis cnc milled screens for their nested house project.
The 3D wave pattern of 2 interfering wave-forms is translated via Grasshopper to the flat surface of perspex screens to be perforated by a 5-axis milling machine at Metropolitan Works.
The attempt is that of creating an interference pattern which will obstruct street views whilst letting light inside the apartment.



Sunday, August 1, 2010
End of July Updates
Below are some quick panoramas of the flat's interior. Everything is still very much work in progress with most of the furnishings and several fittings missing; some errors need rectifying (such as the joiner finishing the wardrobe doors in the wrong RAL colour in an outburst of self proclaimed creativity), but all will be on hold for 2 weeks as everyone in Italy is going on holiday. We are also trying to develop a way of photographing the interiors which will convey the experiential qualities of moving through the different spaces and interacting with the various pieces of furnitures; their textures and details. These will be appearing soon on the blog too.
Saturday, July 24, 2010
July Inspection
As works are coming to an end; during July's site inspection we concentrated on the quality of the finishes and in particular the various paint jobs which appeared to have been rushed a little and therefore need some improving. Additionally the Joiner started delivering the various furniture items which had been undergoing a varnishing process in his workshop. The spaces starting to look more inhabitable and ready to be used.
Sunday, July 4, 2010
London Metropolitan End of Year show
Below are some images of two tables for the London Met end of year exhibition, Andrea created shop files for. They are both located in the UFO unit spaces (Masters and Diploma) and were assembled by London Met students. There is also a simple layout prepared for a recent exhibition at London Met, describing the potential usage of one of the tables designed by UFO Australia.
Labels:
exhibition,
London Metropolitan
Fitting Finishes
Short update on some of the final works to be carried out on site prior to the main furniture elements being brought on site and fixed.
old paint removed with torch and sander
Friday, May 28, 2010
Refurbishment updates
With all of the services prepared and ready, it is now a matter of rendering and finishing the shell. So, recently the floor and wall tiles have been laid down. In particular, the shower is looking great as it appears as its own small room within a larger room. We had a couple of issues with lining up the tiles on non-straight, non-90 degree walls but we came to a solution. Below you can see a plan showing the different choice of floor tiles for different rooms. The larger,living areas use the herringbone pattern and the narrow, corridor like spaces use the parallel plank arrangements.
Apart from rendering and finishing the shell, we have also been deciding upon the details and finishes of the furniture that is getting made for the flat. This has been an interesting process- rendered images have allowed us to see the general look of the furniture within the room but due to the size of it (wardrobe is 2.6m high or bed is 2.1) we have been deciding upon the finishes and materials by making full scale models of only its details.
Next week, the kitchen will be fitted!! Am looking forward to that..
Apart from rendering and finishing the shell, we have also been deciding upon the details and finishes of the furniture that is getting made for the flat. This has been an interesting process- rendered images have allowed us to see the general look of the furniture within the room but due to the size of it (wardrobe is 2.6m high or bed is 2.1) we have been deciding upon the finishes and materials by making full scale models of only its details.
wardrobe handle detail
Next week, the kitchen will be fitted!! Am looking forward to that..
Tuesday, May 11, 2010
In responce to my last blog
Here is an example of how a ritual gives a site significance. It is also a really nice story...
http://www.nytimes.com/2007/08/06/world/europe/06rome.html
http://www.nytimes.com/2007/08/06/world/europe/06rome.html
Wednesday, May 5, 2010
GRID
When the orthogonal grid is used as the starting point for organising and drawing space it is a democratic move because it calls for equal distribution – of space, of load and of weight. It’s a political move and proposes a system of efficiency which ultimately reflects the type of society that is foreseen to inhabit the city – one that is manageable to govern and is given boundaries to grow within. As a system of management, parts of the city grid will hence be zoned out and the development of each zone can then be monitored. The value of a point within the grid is then based on its relationship to other points within the grid. A hierarchy begins to grow between the parts that initially had equivalent value. If the grid is initially free of a hierarchy could it be said to be a tool of liberation? Or is it that when confronted with a site of no historical precedence, a vacuum, the grid is the only move that can be made?
Thomas Holme 1624-1695 : Pennsylvania
The grid that features in much of Superstudio’s speculations could be said to be an act to cancel out existing objects. Without objects, there would be no ownership, no point of time from which an object would come into existence so there would be release from a historical continuum. The new city that emerges comprises of the multiplication of the same component; a square from a grid that becomes a cube. The grid can deny objects but there is still a space that people move within so what comes to the forefront are the inhabitant’s actions. If the grid was the tool that could restart everything, then is the origin always in the form of the grid?
An alternative starting point for spatial organisation and city planning is the path. Australia contains an extensive system of Songlines – the method that enabled indigenous people to map the continent. A person could navigate the land by repeating the words of a song which described landmarks, important watering holes and landscape phenomena said to be traces from the creator-spirit. The path not only located sites for food and water but also became the visual form of a ritual – that which gives significance to a space that then becomes a place. In contrast to the grid as an organisational tool, a path gives space a sequential and hierarchical order and to follow a path is to re-enact a ritual.
However, in the contemporary city space, infrastructure is both the path’s visual form and the object that facilitates a civilisations survival needs. The differences between the types of ritual spaces that exist now within a city are aesthetic or tribal. A tribal path is that which is defined by an individual or a collective of individuals that, by re-enacting a ritual begin to define territories whose frontiers are not fixed or are defined by an alternative phenomena.
In terms of city planning, the overall benefit of the grid is that it activates a vacuum space or a site without context because it doesn’t need objects to do so. A path on the other hand needs reference markers or objects to call it into existence. Where are the vacuum spaces – sites without context located today and can a path undefined by objects be the starting point for its materialisation? And if the grid stands for a democratic move then what would be the social implications of this move?
Fionnuala Heidenreich May 2010
Sunday, April 25, 2010
London Metropolitan MA LAB
Last week the MA LAB was finally completed. After almost 2 years, the design having been updated multiple times and the go ahead obtained to cut the MDF sheets at Met Works; the cut pieces were assembled over two days by a group of MA students. The design was to provide 10 PC work stations for the MA students and ample storage space for models, materials and portfolios. Design limitations included the sole use of friction joints and the lack of fixings to the floor and walls of the room.
Labels:
CNC milling,
London Metropolitan,
Metropolitan Works
Subscribe to:
Posts (Atom)












































